June 2012

ensys_newbury_building_society_logoEnsys Ltd are awarded the contract to carry out service and maintenance to air conditioning installed in the branch network of Newbury Building Society.

April 2012

Ensys_Transit_NewLiveryCongratulations to both Kevin Charman and Nick Ware, who both passed 25 years of service and good luck to Steve Davies who decided to retire after 28 years service.

Ensys also complete the replacement of its vehicle fleet including updated livery to each vehicle.

February 2012

ensysairconditioningatThePrioryBurnhamBack in 1996 Ensys Ltd designed and installed one of the UK’s first Mitsubishi R2 VRF systems in the UK, proudly completing the challenging project on time and within budget. The site, The Priory in Burnham dates back to 1820, and was sympathetically refurbished and extended by its current owners. In 2012 Ensys Ltd have again been awarded the contract to design and install replacement air conditioning as part of an ongoing R-22 replacement program. Mitsubishi Electric R-22 replacement equipment has been chosen by Ensys Ltd, which will bring the 200 year old building bang up to date with the latest digital R410a energy efficient systems. The project is due for completion in the summer of 2012.

October 2011

EnsysSponseredKev-Charman2

Following on his success in 2009 and 2010, Kev Charman wins the 2011 Top Fuel Drag Racing Bike Championship on his Ensys Ltd sponsored Drag Racing bike.

EnsysTop_Fuel_1

Kev’s bike, running nearly 1000 horsepower, can accelerate from standstill to 200mph in less than 7 seconds.

EnsysSponseredKev-Charman

Well done Kev on becoming TF1 in 2011

For further information please see  www.nitrous-junkie.co.uk

August 2011

iorGroupEnsysLogoEnsys Ltd win the project to upgrade HVAC systems at Robert Walters Group’s new Head Office in London. The main contract awarded to interior fit out specialists IOR Group, involved a total fit out of the new offices to cater for more than 800 staff. Modifications and enhancements were made to all HVAC plant to cater for the new levels of occupancy forecasted by Robert Walters

June 2011

EASportsEnsyslogoElectronic Arts (EA Games), award Ensys Ltd with the contract to design and install air conditioning to their Sony PS3 and Microsoft Xbox 360 Test Labs in Surrey. The contract is due to be completed in Summer 2011.

April 2011

WoltersKluwerEnsysEnsys start on a project to supply and install new replacement York chiller plant at Wolters Kluwer in Kingston upon Thames UK. The project due for completion in June 2011 and is to update the existing ageing plant running on old R22 refrigerant.

February 2011

Ensys_MMA_LogoInsurance Services company MMA Insurance award their Service and Maintenance provider Ensys Ltd the project to replace ageing chiller plant at their Head Offices in Reading Berks UK. Ensys Ltd select 255kW Carrier chillers during their design for the project due to be undertaken in March/April 2011

December 2010

ensys-plantronicsMaris Interiors win a contract by Plantronics near Chippenham Wiltshire for relocation works, who in turn award Ensys Ltd with the design and build contract for the air conditioning system.

For their high energy efficiencies, and reliability, Ensys Ltd choose Toshiba MMY Variable Refrigerant Flow systems combined with Toshiba VN heat recovery ventilation systems for the project in Wootton Bassett near Swindon Wiltshire which is due for completion Spring 2011