August 2013

TapestryHaving maintained the air conditioning equipment at Tapestry Media Agency since the mid 80’s, Ensys Ltd are chosen by Tapestry’s management team to design and install all new air conditioning throughout their London offices. Toshiba VRF air conditioning was chosen by Ensys Ltd as the best balance of cost versus specification. The project is due for completion in early 2014.

TapestryMarketingFloorEnsysLtd

March 2013

Ensys_Thames_WaterWipro Technologies as part of a R22 replacement program award Ensys Ltd with the contract to replace air conditioning systems in 39 separate Thames Water sites throughout the region. Each site will have an individual design, and installation all carried out by Ensys, who are using equipment manufactured by Mitsubishi Electric. All sites are due for completion in Summer 2013

February 2013

frasers_ensysAs part of a major hotel refurbishment project, Highend Building Services & StructureTone award Ensys Ltd with the contract to replace and renew Daikin VRV systems at Fraser Suites Queensgate Gardens in London UK. The project is due for completion and handover in August 2013.

January 2013

HolidayInn_EnsysHoliday Inn & Staybridge Suites award Ensys Ltd with the contract to maintain the HVAC plant in their combined hotel building project at the Olympic Park in East London. The project completed in time for the Olympics is situated in the Westfield Centre opposite the Olympic Stadium in Stratford, East London, and was a joint venture between Holiday Inn and Staybridge Suites.

October 2012

Ophir Energy who’s UK Headquarters is in London UK, choose Ensys Ltd to design and install new cooling to their Server Room. Ensys select Emerson Liebert Hiross as the most suitable systems, the installation of which is due for completion in the November 2012.

August 2012

Ensys_MicrofocusFollowing a design carried out by Ensys Ltd, Mitsubishi Electric PFD-P500 downflow systems are installed into the computer facility at the UK HQ of Micro Focus in Newbury Berkshire. The project is due for completion in September 2012 utilises 200kW of cooling using matched condensing units.